TECHNIQUE SOLUTION AS FOLLOWS:
1. Products processing solution
1) customer:; 2) product: NA; 3) material: GJS-500-7,EN-1536 ;
4) the product profile
5) machining accuracy: completely follow up the customer’s drawing;
6) Work tool and fixture: 6” 3-Jaw High Speed Hollow Power Chuck
5) The technique remarks:
7.1>the program will set up the tools life-time management (customer pre-set up the q’ty of the machining products, when reach it, automatically warning, for reducing the products scraps and the tools damage.)
7.2>Installing the additional air-blowing advice on the chuck to make sure no chips on the surface of the fixture.
6) GONGTIE company will do the best to provide the technique guidance for CNC lathes and related suggestion of the products processing technology.
the processing flow proposal:
the first CNC lathe process--- products fixture method and process proposal(example of H=22.4) | ||||||||
| ||||||||
process | tools | Process speed(r/min) | Traverse (mm/r) | Cycle time(S) | ||||
flat head, outside chamfer angle |
| S1600 | F0.1 | ≈9 | ||||
Inside chamfer angle, turning ID |
| S1800 | F0.1 | ≈8.5 | ||||
End face groove |
| S800 | F0.05 | ≈3.5 | ||||
Processing time | ≈25 | |||||||
Auto loading/unloading + air blowing | ≈11 | |||||||
total | ≈27 | |||||||
the second CNC lathe process--- products fixture method and process proposal l(example of H=22.4) | ||||||||
fixture from outside
internal expansion fixture
| ||||||||
process | tools | Process speed(r/min) | Traverse (mm/r) | Cycle time(S) | ||||
Flat head, OD processing |
| S1600 | F0.1 | ≈12 | ||||
ID chamfer angle |
| S1800 | F0.1 | ≈2 | ||||
End face groove |
| S800 | F0.05 | ≈3.5 | ||||
Processing time | ≈25 | |||||||
Auto loading/unloading + air blowing | ≈11 | |||||||
total | ≈21.5 |
9) Proposal CNC lathe:Q7-4D
9.1) CNC lathe: Precise linear guide-way CNC lathe flat bed : Q7
9.2) Auto-loading/unloading system: gantry loader with rotary workstocker in 8 station
10) CNC lathe sketch:
10.1) gantry loader sketch:
10.2) Feeding system: rotary workstocker sketch:
Remarks: the raw materials will be positioned by the rotary workstocker, and then be moved to the chuck end face through the gantry loader, then the chuck clamping, and the gantry loader move to the feeding area(above of the 8 station rotary workstocker,start the processing. After the products be finished, the gantry loader take out the processed products and move to the rotary workerstocker. Taking example of H=22.4, the rotary workstocker can stock around 100PCS products. This CNC machine has the features of stock more, faster feeding and better processing precision.
2. Parameters, configuration and price:
1) parameters:
Main parameters | Unit | Q7 | |
Processing capability | Max. swing diameter | mm | Φ285 |
Swing over cross slide | mm | φ96 | |
Max. turning length | mm | 300 | |
Max. bar through-hole | mm | 26(35) | |
Spindle | Work piece clamping method | N/A | 6“Hydraulic chuck |
Spindle speed range | rpm | 0~5000 | |
Spindle nose size | N/A | A2-5 | |
Spindle ID | mm | 48 | |
Rapid Traverse | X-axis rapid traverse | m/min | 20 |
Z-axis rapid traverse | m/min | 20 | |
Axis Stroke | X-axis travel | mm | 320 |
Z-axis travel | mm | 300 | |
Accuracy | X\Z axis repeating postioning accuracy | mm | 0.002 |
Motor | Spindle drive motor | kW | 3..7/5.5 |
Others | Tool-holder type | N/A | dovetail row of knives |
Tool size | mm | 16 | |
Number of tools | pcs | 5 | |
Cooling motor | kW | 0.12 | |
Required electric power | kVA | 8 | |
Overall size(L*W*H) | mm | 2150*1300*2450 | |
Height from floor to spindle center | mm | ≈1070 | |
Net weight | kg | ≈2000 | |
Standard: Tool box, instruction book, operational manual, cooling system , lighting system, lubrication system, chips cleaner, hydraulic collet(chuck), foot switch.....
| |||
Optional: Program control blowing function, precision C axis dividing, spindle head , automatic door, loading and unloading system, industrial robotic, automatic bar feeder, receiving device for bar materials, automatic detection system, automatic cutter radius compensation system, high-pressure cooling system |
2) Configuration and price
CNC lathe | ||||||||
NO. | ITEM | COMPONENT BRAND & SPEC. | ORIGINAL COUNTERY | QTY. | ||||
1 | Controller | SYNTEC | TAIWAN | 1 | ||||
2 | Servo motor/drive | YASKAWA | JAPAN | 2 | ||||
3 | Spindle motor | CTB 3.7/5.5 | CHINA | 1 | ||||
4 | Ball screw & linear guide-way | PMI | TAIWAN | 2,4 | ||||
5 | Spindle bearings | NTN P4 | JAPAN | 5 | ||||
6 | Spindle structure | Independent spindle with front three bearings and two after | BY GONGTIE | 1 | ||||
7 | Ball screw supporting method | Double supporting with pre-stretching structure | BY GONGTIE | 1 | ||||
8 | Hollow hydraulic rotary cylinder | 536 | TAIWAN COMPONENTS | 1 | ||||
9 | Hydraulic system | SEVEN OCEAN | TAIWAN COMPONENTS | 1 | ||||
10 | Electric cabinet with heat exchanger | NO. 5 | TAIWAN COMPONENTS | 1 | ||||
11 | Low voltage component | SCHNEIDER | FRENCH | 1 | ||||
12 | Hollow hydraulic chuck | 6” | TAIWAN(KOREA) | 1 | ||||
13 | Tool-holder type | T-slot blade row (16) | BY GONGTIE | 1 | ||||
Auto-loading/unloading system | ||||||||
No. | Kit | Brand&original country | QTY. | |||||
1 | Beam kit | GONGTIE | 1 set | |||||
2 | Beam linear guide-way | Taiwan PMI | 1set | |||||
3 | Parallel hand | JAPAN SMC | 1set | |||||
4 | Rotary cylinder | JAPAN SMC | 1set | |||||
5 | Air cylinder | JAPAN SMC | 1set | |||||
6 | Sensor/Magnetic switch | JAPAN SMC | 1set | |||||
7 | Gear wheel/rack(slant gear) | Taiwan | 1set | |||||
8 | Work-stocker system(in tray/pallet) | CHINA | 1set | |||||
9 | Loading/unloading device(mechanical claws) | GONGTIE | 1set | |||||
electrical system for gantry loader | ||||||||
1 | Servo motor | Inovance-china | 1set | |||||
2 | Servo system | Inovance-china(bus type CNC system) | 1set | |||||
3 | Controller system | Inovance-china | 1set | |||||
4 | Gear Reducer | Taiwan | 1set | |||||
5 | interface | Inovance-china | 1set |
3. After-sales service
1) after assembly, immediately carry out test and try-run on the CNC lathe and gantry loader.
2) according to the problem feedback from customer by telephone or FAX, make the reaction within 12H.
3) conducting maintenance door to door, within 24H for Ningbo City, within 48H for zhejiang area, jiangsu area and shanghai. For the other areas, reaction time will be adjusted according to the actual condition.
4) In maintenance guarantee period (one year), if the damage is not caused by operators, we offer free maintenance service, beyond the period, we offer relevant services with paid components.
4. Attachments
Attached items | QTY |
Working instruction | 1 SET |
Machine guarantee card | 1 SET |
Electrics instruction | 1 SET |
Machine inspection report | 1 SET |
CNC system instruction | 1 SET |
Basic tools | 1 SET |
5. Lead time: 40 working days after signing contract
Copyright © Ningbo Gongtie Smart Technology Co., Ltd. All Rights Reserved | Sitemap Powered by